Ground-up data center construction for developers and the capital behind them.
Powered shell through turnkey. Shell, MEP, switchgear procurement, white space, generator yard, cooling plant, and L1 through L5 commissioning, sequenced to the tier you are selling and the utility date your pro forma assumes. For colocation, edge, and enterprise developers across fourteen states. Projects from $1M to $25M.
Capacity online on the date the lease and the loan assumed.
Bentwood builds ground-up data centers for the developers who own them: powered shells sold in phases, turnkey halls for colocation and edge operators, and enterprise facilities built with investor backing. Every project runs through the same operating platform we use for industrial and manufacturing work, calibrated for uptime requirements and tier-aware sequencing.
Our work is judged on schedule predictability and commissioning quality. We put our energy into procurement coordination and sequence discipline so the rest of the build can run quietly in the background.
Shell & Site
Site prep, foundations, structural shell, roofing, and envelope, coordinated with utility availability and substation timing so the building is ready before the gear arrives. Powered-shell delivery where the developer sells capacity in phases.
MEP & Mission-Critical Systems
Power distribution from utility tap through paralleling switchgear, UPS, PDUs, busway, and white space at the densities you specify. N+1 or 2N topology, chilled-water or air-cooled plants, generator yards with paralleled fuel storage, fire suppression and leak detection coordinated with your DCIM.
Commissioning Readiness
L1 through L5 commissioning support, MOP discipline, integration testing coordination with the CxA, and the operator's change-management process. The handover that lets the tenant's operations team sign the acceptance certificate on the first pass.
Long-lead procurement decides the schedule before the first shovel hits the ground.
Switchgear lead times running 52+ weeks. Transformers at 78+ weeks. Diesel generators at 60+ weeks. Chiller plants at 40+ weeks. Any one of these slipping by a quarter pushes substantial completion by a quarter, and most of these orders need to be released before the pad is poured, which means before the construction loan is fully closed. We help you structure the early release so the capital goes out in the order the schedule needs it.
Our platform tracks every long-lead item from submittal approval through factory acceptance testing, ship-watch, and site arrival. When something is trending late, we surface it 60 to 90 days before it affects the critical path. That window is usually enough to find an expedite, swap vendors, or rebalance the schedule before the delivery commitment in your lease is at risk.
What We Track
- Medium-voltage and low-voltage switchgear, paralleling switchgear
- Transformers (pad-mount, dry-type, utility)
- Generator sets, ATS, fuel storage, exhaust systems
- UPS systems, PDUs, RPPs, busway
- Chiller plants, cooling towers, CRACs/CRAHs, in-row units
- Containment systems, hot/cold aisle, plenum work
- Fire suppression (FM-200, Novec, pre-action)
- Building automation, leak detection, environmental monitoring
Method-of-procedure discipline calibrated to the uptime tier you are selling.
A Tier II edge node and a Tier IV concurrently maintainable facility require fundamentally different construction sequences. We plan the sequence backward from the tier target.
MOP discipline begins at foundation pour and continues through L1 prefunctional, L2 startup, L3 functional, L4 integrated systems testing, and L5 operations turnover. Every system that goes live has a documented procedure, a tested fall-back, and a coordination plan with the CxA and the tenant's NOC. Our PMs follow the same checklist, the same escalation paths, and the same documentation standard on every data center project, whether it is in Atlanta, Dallas, or Columbus.
Why it matters to the pro forma: the acceptance certificate is what starts rent, and a failed L4 costs a quarter. Tier-aware sequencing is how we get the tenant's commissioning agent to sign on the first attempt.
Sequencing Capability
- Tier II / III / IV-aware MOPs from foundation through commissioning
- Coordination with the CxA from L1 through L5
- Integration testing planned during shell construction
- Utility coordination (medium voltage, fiber, water, gas)
- Substation tie-in scheduling with the local utility
- Tenant change-management process integration
- Post-commissioning support and warranty rounds
- Phased capacity expansion on the same campus
Utility timing drives the pro forma. We build the schedule around it.
On a data center the dates that matter are the ones you don't control: the utility's energization date, the transformer's ship date, the tenant's commissioning window. We put those on the critical path first and build everything else to land underneath them, so the capital you release early is released in the right order and the draw schedule matches the equipment milestones your lender is underwriting.
Whether you are delivering a powered shell to sell in phases, a turnkey hall for a colocation tenant, or a campus you will expand for a decade, you get one Bentwood team and one procurement log, carried from the first phase to the last.
One Operating Standard, Every Build
- Powered-shell or turnkey delivery, phased to how you sell capacity
- Early gear release structured to the loan draw schedule
- Draw packages aligned to equipment and commissioning milestones
- Cross-site engineering reuse: switchgear specs, MOPs, MEP drawings
- Sub prequalification handled per state, transparent to your team
- Live visibility into cost position, schedule risk, and procurement state
Every long-lead item and every commissioning gate is reported as it moves, with no month-end reporting cycle in between.
Have a data center build in the pipeline?
We will review your tier target, utility timing, and long-lead status before discussing next steps.
Contact BentwoodQuestions we hear a lot.
Do you build data centers from the ground up?
Yes, from shell through commissioning, including switchgear and gear procurement and tier-aware sequencing. The long-lead equipment usually drives the schedule, so we track it from release to delivery.
Do you deliver powered shell as well as turnkey?
Yes. For developers selling or leasing capacity in phases, we deliver the powered shell with the utility service, pads, and structure sized for the full build, then add halls and gear as capacity is sold. The phasing plan is written into the budget and the draw schedule from the start.
How do you handle long-lead switchgear and electrical equipment?
We track every long-lead item from submittal through approval, factory acceptance test, and delivery, and we flag a slipping date before it moves so there is still time to mitigate. Most gear is released before the pad is poured, and the release dates are in the schedule you approve.
What states do you build data centers in?
Across our fourteen-state footprint in the Southeast, Texas, and the Midwest. Utility timing differs by market more than anything else does, and that is where we start.