Industrial & Logistics

Spec and build-to-suit industrial, delivered to the lease-up plan.

Tilt-up shells, cross-dock and rear-load distribution, cold storage, and the repositioning of acquired industrial assets, for developers and value-add investors across fourteen states. Projects from $1M to $25M.

What We Build

We build the shell to the condition a tenant signs for.

Ground-up and value-add industrial across the Southeast, Texas, and the Midwest, built around the yield-on-cost and the rent-commencement date behind it.

Ground-Up Spec & Build-to-Suit

Site work, slab, tilt-up panels, roof, ESFR, dock package, and shell completion. Cross-dock, rear-load, and front-park configurations sized to the submarket, with spec office and the power a tenant expects to find.

Value-Add Repositioning

Roofs, docks and levelers, demising and spec suites, office refresh, LED and power upgrades, ESFR conversion, truck courts and trailer parking. Sequenced around the tenants that are paying so the building earns while it improves.

Cold Storage & Cold Chain

Refrigerated and frozen facilities for food, pharma, and third-party logistics operators and the groups that develop for them. The envelope and the refrigeration are the asset, and we build them that way.

Tilt-Up Shells

On a tilt-up shell, the schedule turns on crane day.

On a tilt-up shell the critical path runs through the slab, the casting beds, and crane day. We lay out the panels with the engineer around the crane plan so lifts run in sequence and the roof deck follows the last panel instead of waiting on it.

Early-release packages for site work, foundations, and slab go out under phased permits where the jurisdiction allows, which is how a shell is standing while the full set is still in review. The dock package, ESFR, and spec office are bought early so the long-lead items land before the tenant's broker brings the first tour.

Shell Scope

  • Site work, grading, utilities, and truck-court paving
  • Slab-on-grade designed as the casting bed
  • Panel engineering, casting sequence, and crane-day execution
  • Roof structure, deck, and membrane
  • ESFR fire protection and fire pump
  • Dock doors, levelers, seals, and drive-in doors
  • Spec office, restrooms, and electrical service sized for lease-up
  • Shell completion to the tenant-delivery condition in your lease form
Why Bentwood for Industrial

On industrial work, the schedule usually slips at the order desk.

The field rarely causes the slip. Switchgear, dock equipment, roof membrane, fire pumps, refrigeration packages, and the transformer the utility says is eighteen months out cause far more missed dates than labor does.

We track every long-lead item from release through fabrication to delivery, and we tell you a date is at risk before it moves, while there is still time to buy a different path. Our partners tell us that early warning is the thing they don't get from other contractors.

How We Run It

  • Conceptual budget and schedule while you are still under LOI
  • Early-release site, foundation, and slab packages under phased permits
  • Long-lead procurement tracked item by item to site
  • Open-book buyout against the GMP, savings returned per the agreement
  • Monthly draw packages your lender can fund on the first request
  • Tenant-delivery conditions documented against the lease form
For Value-Add Investors

Buying an industrial asset? We walk it before you close.

The difference between a value-add deal that works and one that doesn't is usually a roof, a slab, or a power service nobody priced during diligence. We walk the building with you in due diligence and hand you a capex budget by line item, priced from what we are paying in that metro today.

After closing, the same team executes the plan: the work that lifts rent first, sequenced around the tenants still paying, with every dollar visible against the budget you underwrote.

What We Look At in Diligence

  • Roof condition, remaining life, and restoration versus replacement
  • Slab, joints, and floor flatness for the tenant you are targeting
  • Docks, levelers, doors, and truck-court condition
  • Fire protection: ESFR capability, pump, and storage commodity limits
  • Electrical service, distribution, and what a tenant will ask for
  • Office, restrooms, and demising for spec-suite strategy
  • Site: drainage, trailer parking, and expansion potential
Specialty: Cold Chain

Cold Storage Construction

Refrigerated, frozen, and ultra-low-temperature facilities where a thermal-bridge gap becomes an operating problem and a lease dispute.

Cold storage sits between general industrial and process work. Insulated metal panel envelopes, refrigeration integration, vapor barriers, freezer-floor heating, and load-rated dock equipment all have to land together with no condensation surprises at commissioning.

We build for food processors, pharma cold-chain operators, third-party logistics providers, and the developers delivering build-to-suit cold buildings for them.

Capability Areas

  • Insulated metal panel envelopes, refrigerated and frozen
  • Refrigeration integration and ammonia / CO₂ coordination
  • Vapor barrier discipline on the cold-side condensation plane
  • Freezer floor heating and thermal-bridge prevention
  • Dock leveler and cold-storage door installation
  • Food-grade finishes (USDA / FDA where applicable)
  • Commissioning and performance testing coordination
For Multi-Market Groups

Industrial capital never stays in one metro.

If you are buying in Nashville this quarter and developing in Dallas or Indianapolis next, every market raises the same questions: whether the budget will hold, whether procurement will track, and whether the contractor who was great on the last deal will perform in a state they have never worked in.

With Bentwood the answer is the same everywhere, because the process is the same everywhere. Our long-lead tracking, our draw packages, and our reporting aren't "Tennessee Bentwood" or "Texas Bentwood." They're just Bentwood.

One Standard, Every Deal

  • Same project-management process at every site, in every state
  • Procurement and long-lead tracking running the same way everywhere
  • One Bentwood relationship across your portfolio
  • Sub prequalification and licensing handled per state, transparent to you
  • Live visibility into every deal's cost position and schedule risk

When you enter a new metro, the first call is with people who already know your lease form, your lender, and your reporting format.

Have a site, a shell, or an acquisition in play?

Tell us the submarket, the product type, and your basis. We will tell you what we would watch for before anything is committed.

Contact Bentwood
Common Questions

Questions we hear a lot.

Do you build speculative industrial buildings for developers?

Yes. Tilt-up spec and build-to-suit shells are our core industrial product: site work, slab, panel casting, crane day, roof, ESFR, dock package, and shell completion to the condition a tenant signs for. We schedule the shell to your lease-up plan and your lender's draw calendar.

Can you walk an industrial asset before we close on it?

Yes. Due-diligence walks are a normal part of how we work with investors. We look at the roof, slab, docks and levelers, fire protection, power, office condition, and truck court, and we hand you a capex budget by line item you can put in the model while you are still under LOI.

What does repositioning an acquired industrial building usually involve?

Roof replacement or restoration, dock and door packages, demising and spec suites, office refresh, LED and power upgrades, ESFR conversion, truck-court and trailer-parking work, and whatever it takes to re-tenant the building at the rent you underwrote. Most of it happens while the building is partially occupied, and we sequence around the tenants that are paying.

Do you handle cold storage construction?

We do, across refrigerated, frozen, and ultra-low-temperature applications. The envelope and the refrigeration are the asset in a cold building, so insulated panel detailing, vapor barriers, freezer-floor heating, and commissioning get the same rigor as the structure.

What states do you cover for industrial projects?

Fourteen, across the Southeast, Texas, and the Midwest, with the same process and the same project-management standard at every site.