Healthcare

Medical real estate that starts earning on the date you underwrote.

Ground-up medical office buildings, ambulatory surgery centers, and outpatient clinics for healthcare developers, plus repositioning and conversion of existing buildings to medical use. Licensing and rent commencement on the critical path from day one, across fourteen states. Projects from $1M to $25M.

What We Build

A medical building earns rent only when the tenant can see patients. We build to that date.

Medical construction demands a higher level of planning, because the inspections that let a practice open are the inspections that start your rent.

We work with developers, their physician partners, designers, and the authorities having jurisdiction so each building passes licensing on the first visit, and so equipment, medical gas, and imaging shielding are bought and placed before they can hold up the schedule.

Ground-Up MOB, ASC & Outpatient

Medical office buildings, surgery centers, imaging centers, and multi-specialty clinics developed for healthcare systems and physician groups. Core and shell sized for medical loads, with tenant delivery conditions written to the lease.

Repositioning & Conversion

Existing MOBs renovated for a new tenant mix, and office or retail buildings converted to medical use. MEP capacity, medical gas, shielding, and accessibility answered before you close, with the cost of changing each one.

Landlord Work & Tenant Delivery

The landlord's scope inside a developer-owned building, delivered to the practice's opening date: exam and procedure rooms, imaging suites, sterile processing, and the ICRA discipline the occupied floors require.

Project Types

The kinds of medical real estate we know.

Bentwood works across the full spectrum of outpatient medical real estate, from a single-tenant specialty building through multi-tenant MOBs and ambulatory surgery centers, ground-up and in existing buildings.

  • Medical office buildings (MOB), ground-up and repositioned
  • Ambulatory surgery centers (ASC), including OR suites and sterile processing
  • Outpatient clinics and multi-specialty centers
  • Imaging centers with MRI, CT, and X-ray shielding
  • Urgent care and specialty practice buildings, single and multi-site
  • Office and retail conversions to medical use
  • Cleanroom, compounding pharmacy, and lab construction (see below)
For MOB Developers

The decisions that make a shell medical-ready are made before the first tenant signs.

A medical office building built as ordinary office space with a different sign will cost its developer the best tenants. An imaging group needs floor capacity, vibration control, and a path to get a magnet into the building. A surgery center is an ambulatory health care occupancy under the life safety code rather than a business occupancy, which changes the smoke compartments, the emergency power, and the medical gas. All of that is far cheaper to provide at core and shell than to retrofit through an occupied floor.

We work with the developer and the design team to decide what the shell will carry before it is priced: which floors can take an ASC, where imaging can go, how much electrical service and shaft space the building holds in reserve, and where the generator and medical gas rooms sit. The tenant's allowance then buys finishes and equipment instead of structure.

Shell Provisions We Plan For

  • Floor-to-floor height and shaft space for medical exhaust, medical gas, and the ductwork an OR needs
  • Structural capacity, vibration criteria, and a rigging path for MRI and CT
  • Ambulatory health care occupancy provisions on the floors that may take a surgery center
  • Electrical service sized for imaging and an ASC, with the essential electrical system and generator pad in place
  • Medical gas manifold room, zone valve locations, and the vacuum and medical air plant
  • Plumbing capacity for sterile processing, exam rooms, and procedure rooms
  • Accessible routes, patient drop-off, and ambulance access where the use calls for it
  • Tenant delivery conditions written to the lease form the developer uses
The Sequence That Starts Rent

A medical building can be substantially complete and still months from earning rent.

The certificate of occupancy is the first inspection in the sequence, and the lease usually starts rent on the last one. We build all of them into the baseline schedule.

01

Certificate of Need

In the states that require one, the CON decision sits in front of everything else. We price and schedule to that date and keep preconstruction moving while the application is pending.

02

Certificate of Occupancy

The building department's inspection, with the medical gas system verified by a certified third party and the imaging shielding confirmed against the physicist's report before it.

03

State Licensure

The state health department surveys a surgery center or licensed clinic before it can see patients. We carry the survey date on the construction schedule and walk the building against the surveyor's checklist before the surveyor arrives.

04

Accreditation and Medicare

For an ASC, accreditation and Medicare certification follow licensure, and the tenant's revenue depends on them. The documentation package those surveys ask for is handed to the tenant on the day we turn over the building.

For Healthcare Developers & Investors

In medical work, equipment and inspections drive the schedule.

Imaging equipment, sterilizers, medical gas, and the state's licensing calendar own the critical path on a medical building. We track every long-lead item from submittal through approval, fabrication, and delivery, and we build the inspection sequence into the schedule you approve, so the opening date in the lease is a date we are building to.

An existing MOB is worth what its tenant mix will pay, and the tenant mix is limited by what the building can take: MEP capacity, medical gas, whether an imaging tenant can be shielded on the floor you want to lease, and whether the structure will carry it. An investor acquiring one gets those answers from us before closing, with the cost of changing each one.

How We Run It

  • Conceptual budget and schedule to rent commencement while you are under LOI
  • CON, licensing, and accreditation surveys built into the baseline schedule
  • Long-lead medical equipment and medical gas tracked to site
  • Landlord and tenant scope reconciled to the lease, in writing
  • ICRA discipline when the building is occupied
  • Monthly draw packages your lender can fund on the first request
Specialty Capability

Cleanroom & Lab Construction

For buildings where the construction is the regulatory deliverable.

Cleanroom and lab construction sits at the intersection of medical, industrial, and process engineering. Most general contractors are not built for it; most cleanroom specialists are not built for the real estate side. We do both, for the life-science developers delivering the building and the operators who will run it.

We build cleanroom enclosures, BSL-2 labs, and USP 797/800 compliant compounding spaces, and we coordinate the validation and commissioning that let the tenant start operating.

Capability Areas

  • USP 797 / 800 compliant compounding pharmacies
  • ISO Class 5 / 7 / 8 cleanroom enclosures
  • BSL-2 laboratory build-outs
  • Process utility integration: clean steam, RO/DI water, compressed gases
  • HEPA-filtered air handling and positive/negative pressure cascade
  • Smooth-wall, monolithic-floor, washable surface systems
  • Validation-ready documentation packages
  • Coordination with equipment vendors and validation consultants
Physician Partners

The physicians will change their minds about the rooms. We plan for it.

Most healthcare developments have a physician group as the anchor tenant or as a partner in the deal, and physicians look at a floor plan differently once they can stand in it. Room sizes move. A procedure room becomes an OR. The imaging vendor changes and the shielding changes with it. None of that surprises us, and none of it should cost the developer the basis.

We build the review points into the schedule, we put the cost and the schedule effect of a change on paper before a wall moves, and we work with the tenant's equipment planner so the long-lead items are bought once. When a health system is the tenant, its design standards and its facilities team are in the process from the first OAC meeting.

How We Keep Changes From Costing the Basis

  • Room-by-room sign-off with the physician group at each design milestone
  • Mock-up exam or procedure room where the program justifies it
  • Equipment list frozen with the planner before long-lead release
  • Every change priced with its schedule effect before approval
  • Health system design standards and facilities reviews built into the schedule
  • The landlord and tenant share of each change assigned to the lease line in writing

Developing or acquiring a medical building?

We will review your tenant mix, your opening date, and your basis before discussing next steps.

Contact Bentwood
Common Questions

Questions we hear a lot.

Do you build medical office buildings and surgery centers from the ground up?

Yes. Ground-up MOBs, ambulatory surgery centers, and outpatient clinics for healthcare developers are our core healthcare work, along with the landlord work and tenant delivery inside them. We build to the licensing and accreditation surveys that let the practice open, because those are the inspections that start rent.

Do you work in certificate-of-need states?

Yes. Several of the states we work in require a certificate of need for a surgery center or another licensed facility. The CON decision sits in front of the construction schedule, so we budget and schedule to that date and keep preconstruction moving while the application is pending.

Can you convert an office or retail building to medical use?

Yes. Conversion to medical turns on structure, MEP capacity, medical gas, imaging shielding, and accessibility. We look at all five before you close and give you the cost of each gap by line item.

Can you renovate a medical building while tenants are still seeing patients?

Yes. Phased construction in active clinical environments is routine for us: infection-control risk assessment, negative pressure where required, and sequencing that keeps the practices that are paying rent open.

Can you handle cleanroom or compounding pharmacy build-outs?

Yes. We build cleanrooms, BSL-2 labs, and USP 797/800 compounding spaces to the classification and finish requirements the use demands, and we coordinate the certification and commissioning.

What states do you cover for healthcare projects?

Fourteen, across the Southeast, Texas, and the Midwest. Licensing rules and CON requirements differ by state, and we plan each building to the rules of the state it sits in.