Process-ready buildings, on a schedule a lender can finance.
Build-to-suit plants, conversions of existing buildings to production, food and beverage facilities, and expansions planned around the line. For the developers who own the building, the investors who back the operator, and the manufacturers in between. Projects from $1M to $25M.
This page is about making and processing a product. If your project is about storing or moving goods, see Industrial & Logistics. Plenty of developers and operators need both, and one Bentwood team can run them together.
We build the building around the process that will run in it.
Production and processing facilities across the Southeast, Texas, and the Midwest, ground-up and inside existing buildings.
Build-to-Suit & Ground-Up Plants
Developer-owned, tenant-specified. Structure, slab, power, process utilities, and crane or equipment foundations delivered against the tenant's equipment set dates, with base-building and process scope split cleanly for the lease.
Conversions & Expansions
Warehouses and vacant plants converted to production, and expansions inside operating plants. We work the schedule around the shifts and keep the running lines running.
Food & Beverage and Controlled Environments
Washdown construction, food-grade finishes, drainage, and sanitary detailing to USDA and FDA expectations. Clean and controlled production spaces for life sciences and advanced manufacturing.
Plant projects go wrong at the process utilities, so that is where we start.
A production build is only as good as the air, water, gas, power, and drainage feeding the equipment. Get a tie-in wrong and the line that was supposed to start Monday doesn't, and the rent that was supposed to commence doesn't either. We plan utility integration first and coordinate the shutdown windows before the first crew mobilizes.
We track every long-lead item, from custom equipment foundations to switchgear and the transformer the utility controls, and flag a slipping date early enough to act on it. Procurement, more than the crew, is what holds a plant project up, and we manage it accordingly.
How We Run It
- Base-building versus process scope defined before the lease is signed
- Tenant equipment set dates on the critical path from the first schedule
- Process utility integration: air, water, gas, power, drainage
- Planned tie-in and shutdown windows, agreed in advance
- Safety planning around active machinery and energized systems
- Coordination with equipment vendors and commissioning agents
- Long-lead procurement tracked item by item
A plant is a slab, an electrical service, and a yard. Get those three right and the tenant's process fits.
Most of what makes a manufacturing building different from a warehouse is below the floor and behind the switchgear. The slab has to carry point loads, pits, and trenches the tenant's equipment layout will dictate late. The electrical service has to be sized for a load the tenant is still calculating, with a utility transformer on a lead time the utility controls. The yard has to handle inbound raw material and outbound finished goods on different docks, and sometimes a rail spur.
We design the shell with those provisions in it, and we draw the line on the documents between what the landlord delivers and what the tenant adds, so a slab thickening or a crane column does not become a structural change order after the lease is signed.
What the Shell Has to Carry
- Slab thickness, reinforcing, joint layout, and flatness for the tenant's equipment and material handling
- Isolated equipment foundations, pits, and trenches located before the slab is poured
- Electrical service and utility transformer sized and released early, with room to grow
- Clear height, bay spacing, and roof capacity for process piping, conveyors, and mezzanines
- Crane runways, columns, and hook height where the process needs a bridge crane
- Process utility yard: compressed air, chillers, gas pressure, and nitrogen or CO₂ storage pads
- Process drainage with pretreatment, separated from storm and sanitary
- Inbound and outbound docks, truck court, and rail where the site allows it
A build-to-suit has two owners of the scope. We keep the line between them clear.
The developer owns the building. The tenant owns the process. The lease draws the line between them, and if the construction documents don't draw the same line, the change orders start on day one. We take the tenant's specification and translate it into a landlord budget and a tenant budget before the lease is executed, so both sides sign knowing what they are paying for.
An investor buying a vacant plant, or converting a warehouse to production, is mostly buying a slab, an electrical service, and a drainage system. The finishes are the easy part. We tell you what those three will support, what the next tenant will ask for beyond that, and what closing the gap costs, in time to put the number in the model.
Where the Lease Line Usually Gets Argued
- Slab thickenings, pits, and trenches the equipment layout dictates late
- Crane runways and the columns designed to carry them
- Utility stubs at the wall versus process piping to the machine
- Electrical distribution beyond the main service
- Roof reinforcement and penetrations for process exhaust
- Process drains, pretreatment, and floor slope
- Equipment foundations, anchor bolts, and vibration isolation
We put each of these on the landlord's side or the tenant's side in writing before the lease is executed. When the tenant's process engineers want a seat in the OAC meeting, they have one, and the minutes record which side of the line each decision fell on.
Food and Beverage Processing
Buildings that get audited by the processor's customers as well as by the inspector.
A food plant is built to be washed down every night and audited every year. The floor, the walls, the drains, and the ceiling are all part of the sanitation program, and a detail that traps water or harbors pests fails an audit the processor cannot afford to fail. We build to USDA and FDA expectations where they apply and to the hygienic design behind the SQF and BRCGS audits the processor's customers require.
We build for food and beverage processors and for the developers delivering build-to-suit plants to them, often with refrigerated and frozen space inside the same building, which is where our cold storage work carries over.
Capability Areas
- Washdown-rated construction with sloped floors and trench or area drains
- Urethane cement flooring and coved wall bases
- Insulated metal panel walls and ceilings with sealed joints
- Hygienic zoning: raw and ready-to-eat separation, personnel and product flow
- Refrigerated and frozen process rooms with the vapor barrier detailed correctly
- Process utilities: clean steam, CO₂, compressed air to the required class, hot and chilled water
- Pest exclusion detailing at doors, penetrations, and dock seals
- Pretreatment and grease management on the process drain system
Building inside a plant that is still running.
An expansion is scheduled around the plant, never the other way around. Before any work starts, we sit down with the plant manager, the maintenance lead, and the EHS staff and agree on the tie-in windows, the shutdowns, and the hours our crews can work next to a live line. Most tie-ins happen on a weekend or during a planned maintenance outage, and they are rehearsed on paper first.
Inside the building, temporary partitions and negative air keep construction dust out of production, hot-work and lockout permits run through the plant's own system, and fire protection stays in service except for the windows we agree on. If a crane pick has to go over live equipment, the plant knows the day, the hour, and the path.
How an Expansion Runs
- Tie-in and shutdown windows agreed with plant engineering and EHS before mobilization
- Work hours set to the shift schedule, including nights and weekends where needed
- Temporary partitions, negative air, and dust control at the construction boundary
- Hot work, lockout and tagout, and confined-space permits run through the plant's system
- Fire protection and life safety maintained, with impairment notices when they are not
- Crane picks and deliveries routed and scheduled around production
- Incentive and lease deadlines carried on the same schedule as the construction
Planning a plant, a conversion, or an expansion?
Tell us about the process, the equipment, and the production schedule it has to protect. We build the plan around it.
Contact BentwoodQuestions we hear a lot.
Do you build build-to-suit manufacturing facilities for developers?
Yes. A build-to-suit plant has two owners of the scope, the developer who owns the building and the tenant who owns the process, and we split base building from process work cleanly so the lease, the budget, and the schedule all read the same way. The tenant's equipment set dates sit on the critical path from the first schedule.
Can you convert an existing building to production use?
Yes. Converting a warehouse or a vacant plant to manufacturing comes down to the slab, the electrical service, the process utilities, and the drainage. We assess all four before you close and give you a line-item cost for the gap between what the building has and what the tenant needs.
Can you expand a plant without shutting down the line?
That is the normal case for us. We plan around the shift schedule, agree on tie-in and shutdown windows with the plant's engineering and EHS staff before any work starts, and sequence the build so the running lines keep running.
Do you build food and beverage processing facilities?
Yes, including washdown construction, food-grade finishes, drainage, and sanitary detailing held to USDA and FDA expectations where they apply, and to the audit scheme the processor's customers require.
How is this different from your industrial and logistics work?
This work is about making or processing a product. Industrial and logistics is about storing and moving goods. Plenty of developers and operators need both, and one Bentwood team can run them together.